• Čeština Čeština Czech cs
  • English English English en
Elzel
  • Introduction
  • About us
    • The Company’s Structure
      • Ownership’s Structure
      • The Companyś Management
      • Organization chart
      • Centres / Branches
    • The Company´s History
    • Economic Results
    • Integrated management system policy
    • Whistleblowing
  • GDPR
  • Our activities
    • Design
    • Technical Development and Engineering
    • Accredited Testing Laboratory
    • Production>
      • Components of Overhead Contact Line (OCL)
      • Steel Constructions
      • LV- HV-VHV Switchboards
      • Special Devices
        • Block Transformer Station
        • Voltage Indicator
        • Motor Drive
        • POZ-EŽ Control Panel
        • EZB-PM I. Traction Mobile Rectifier Substation
        • Production for Automotive Industry
    • Assembly>
      • Railway OCS
      • Tram and Trolleybus OCS
      • Technological Systems
    • Service of railway electric equipment
    • Other >
      • Railway vehicles
      • Equipping railway vehicles
      • Software development for setting SFC parameters
  • References
    • Overhead contact lines for railways
    • Public transportation
    • Technologies
    • Energetics
    • Export
  • Download
    • Company profile
    • Certificates
    • Product leaflets
    • Logo
  • Product catalogue
    • OCL Assemblies
    • Public Transport catalogue
    • Component catalogue
  • Contacts
    • Basic Contacts
  • Search
  • Menu Menu

Reconstruction of the tram line Evropská, Prague

Investor: Dopravní podnik hl. m. Prahy, a.s.

Customer: Metrostav a.s.

Technical Data, Description:

In the framework of the reconstruction of the tram line Evropská, EŽ Praha delivered the construction of buildings SO 21 Trolley line, SO 22 Electrical control and heating of exchanges and SO 24 JDCT track cables.

The works were conducted in two phases, the first stage was from September to November 2013, the second phase was from April to May 2015. A partial change of contact wire was made, 42 pcs of masts was built and a new loop Červený vrch was built. Part of the work was the restoration of all the tracks earthing. The overhead contact line is a simple, compensated, Cu 120 mm2 contact wire. The total length of the dismantling and assembly of the contact wire was 5 200 m. Additionally, technology for controlling and heating 10 pcs railroad switches has been delivered and installed. Within the framework of the track cables, 4 back and 3 power cabinets and cable recesses were made in the total length of 4530 m.

Total Investment cost:  CZK 19 196 419,- (excl. VAT)

Realized in: 9/2013 – 5/2015

Managing Director Office:

Phone: +420 296 500 111
Fax: +420 296 500 700
E-mail: info@elzel.cz, www.elzel.cz
Data box: eaedvez

Address:

Elektrizace železnic Praha a.s.
nám. Hrdinů 1693/4a
140 00 Praha 4
Czech Republic

Bank:

ID: 47115921 TAX ID: CZ47115921

ČSOB Prague, account number: 216025493/0300 Company registered in the commercial register
maintained by the Municipal Court in Prague, section B, insert 1809.

© Copyright - Elektrizace železnic I Designed by Silic Média Creative
MODENA – replacement of trolleybus switches Adjustment of service and washing areas for the operation of buses with CNG...
Scroll to top