• Čeština Čeština Czech cs
  • English English English en
Elzel
  • Introduction
  • About us
    • The Company’s Structure
      • Ownership’s Structure
      • The Companyś Management
      • Organization chart
      • Centres / Branches
    • The Company´s History
    • Economic Results
    • Integrated management system policy
    • Whistleblowing
  • GDPR
  • Our activities
    • Design
    • Technical Development and Engineering
    • Accredited Testing Laboratory
    • Production>
      • Components of Overhead Contact Line (OCL)
      • Steel Constructions
      • LV- HV-VHV Switchboards
      • Special Devices
        • Block Transformer Station
        • Voltage Indicator
        • Motor Drive
        • POZ-EŽ Control Panel
        • EZB-PM I. Traction Mobile Rectifier Substation
        • Production for Automotive Industry
    • Assembly>
      • Railway OCS
      • Tram and Trolleybus OCS
      • Technological Systems
    • Service of railway electric equipment
    • Other >
      • Railway vehicles
      • Equipping railway vehicles
      • Software development for setting SFC parameters
  • References
    • Overhead contact lines for railways
    • Public transportation
    • Technologies
    • Energetics
    • Export
  • Download
    • Company profile
    • Certificates
    • Product leaflets
    • Logo
  • Product catalogue
    • OCL Assemblies
    • Public Transport catalogue
    • Component catalogue
  • Contacts
    • Basic Contacts
  • Search
  • Menu Menu

Erzsebet – Nevtelen

Investor: Debrecen Transport Authority (DKV)

Customer: Vasutvill kft.

Technical Data, Description:

EŽ Praha realized the supply and installation of the overhead line – without earthworks and masts.

The main purpose of the construction was the replacement of the electric trolleybus switches in Debrecen for new ones. Adaptation of the overhead contact line around switches and reconstruction of T type trolleybus cross Erzsebet x Nevtelen was also part of the construction. The overhead contact line is clear, the trolley Cu 100 mm2 (1900 m), the contact wire hinges are mainly flexible arc terminals. Supplied switches – 9 sets of 10 °electric switches (tension type) and automatic road setting system, including related trolleybus equipment. Switchboards to switches are located on masts, with two signaling LEDs for each switch.

Total Investment cost:  CZK 9 117 692,- (excl. VAT)

Realized in: 6/2011 – 5/2012

Managing Director Office:

Phone: +420 296 500 111
Fax: +420 296 500 700
E-mail: info@elzel.cz, www.elzel.cz
Data box: eaedvez

Address:

Elektrizace železnic Praha a.s.
nám. Hrdinů 1693/4a
140 00 Praha 4
Czech Republic

Bank:

ID: 47115921 TAX ID: CZ47115921

ČSOB Prague, account number: 216025493/0300 Company registered in the commercial register
maintained by the Municipal Court in Prague, section B, insert 1809.

© Copyright - Elektrizace železnic I Designed by Silic Média Creative
Szeged, Hungary – Tram Line No. 2 Reconstruction of the tram line in the section Klicperova – U Lomu, Liber...
Scroll to top