• Čeština Čeština Czech cs
  • English English English en
Elzel
  • Introduction
  • About us
    • The Company’s Structure
      • Ownership’s Structure
      • The Companyś Management
      • Organization chart
      • Centres / Branches
    • The Company´s History
    • Economic Results
    • Integrated management system policy
    • Whistleblowing
  • GDPR
  • Our activities
    • Design
    • Technical Development and Engineering
    • Accredited Testing Laboratory
    • Production>
      • Components of Overhead Contact Line (OCL)
      • Steel Constructions
      • LV- HV-VHV Switchboards
      • Special Devices
        • Block Transformer Station
        • Voltage Indicator
        • Motor Drive
        • POZ-EŽ Control Panel
        • EZB-PM I. Traction Mobile Rectifier Substation
        • Production for Automotive Industry
    • Assembly>
      • Railway OCS
      • Tram and Trolleybus OCS
      • Technological Systems
    • Service of railway electric equipment
    • Other >
      • Railway vehicles
      • Equipping railway vehicles
      • Software development for setting SFC parameters
  • References
    • Overhead contact lines for railways
    • Public transportation
    • Technologies
    • Energetics
    • Export
  • Download
    • Company profile
    • Certificates
    • Product leaflets
    • Logo
  • Product catalogue
    • OCL Assemblies
    • Public Transport catalogue
    • Component catalogue
  • Contacts
    • Basic Contacts
  • Search
  • Menu Menu

Complete reconstruction of the traction transformer station Mýto

Client: SŽDC, s.o.

Investor: SŽDC, s.o.

Technical data, description:

The complete reconstruction of the Mýto traction transformer station is a part of the construction of the Third Railway Corridor of selected network of railway lines, specifically building “Optimization of the Line Zbiroh – Rokycany”. The project included the following: reconstruction of outside substation technology (123 kV), including control and supervision system, supply and installation of single-phase transformers 123/27.5 kV (covered design), supply and installation of a 27.5 kV AC substation (cabinet design), including control and supervision system, supply and installation of filtration/compensation equipment, reconstruction of own consumption and supervisory system technology, incl. resulting modifications at the electrical control room in Pilsen. The project also included the reconstruction of supply/return cabling and its connection to the simultaneously reconstructed overhead contact lines for the open track Holoubkov – Rokycany.

Total investment costs: CZK 97 625 523 (excl. VAT)

Realization date: IV/2011 – XI/2011

Managing Director Office:

Phone: +420 296 500 111
Fax: +420 296 500 700
E-mail: info@elzel.cz, www.elzel.cz
Data box: eaedvez

Address:

Elektrizace železnic Praha a.s.
nám. Hrdinů 1693/4a
140 00 Praha 4
Czech Republic

Bank:

ID: 47115921 TAX ID: CZ47115921

ČSOB Prague, account number: 216025493/0300 Company registered in the commercial register
maintained by the Municipal Court in Prague, section B, insert 1809.

© Copyright - Elektrizace železnic I Designed by Silic Média Creative
Reconstruction of the substation Klárov Modernization of the Line Veselí n. L. – Tábor, Part II, Section Veselí...
Scroll to top