Modernization of Railway Line VoticeBenešov u Prahy

Client: Eurovia CS a.s.
Investor: SŽDC, s.o., SS Praha
Technical data, description:

Complete reconstruction of overhead contact lines for the 25 kV/ 50Hz AC system for dual-track line, carried out during full operation including a newly built overhead contact system in tunnels, reconstruction of heavy current lines, outside lighting and lighting, cable lines tunnels, remote control of section disconnectors, installation of electric heating of switches and technology of transformer stations for power supply of electrical equipment in tunnels.

Total investment costs: CZK 266 047 166 (excl. VAT)

Realization date: VII/2009 – V/2013