• Čeština Čeština Czech cs
  • English English English en
Elzel
  • Introduction
  • About us
    • The Company’s Structure
      • Ownership’s Structure
      • The Companyś Management
      • Organization chart
      • Centres / Branches
    • The Company´s History
    • Economic Results
    • Integrated management system policy
    • Whistleblowing
  • GDPR
  • Our activities
    • Design
    • Technical Development and Engineering
    • Accredited Testing Laboratory
    • Production>
      • Components of Overhead Contact Line (OCL)
      • Steel Constructions
      • LV- HV-VHV Switchboards
      • Special Devices
        • Block Transformer Station
        • Voltage Indicator
        • Motor Drive
        • POZ-EŽ Control Panel
        • EZB-PM I. Traction Mobile Rectifier Substation
        • Production for Automotive Industry
    • Assembly>
      • Railway OCS
      • Tram and Trolleybus OCS
      • Technological Systems
    • Service of railway electric equipment
    • Other >
      • Railway vehicles
      • Equipping railway vehicles
      • Software development for setting SFC parameters
  • References
    • Overhead contact lines for railways
    • Public transportation
    • Technologies
    • Energetics
    • Export
  • Download
    • Company profile
    • Certificates
    • Product leaflets
    • Logo
  • Product catalogue
    • OCL Assemblies
    • Public Transport catalogue
    • Component catalogue
  • Contacts
    • Basic Contacts
  • Search
  • Menu Menu

I/13 Chomutov – bridge reg.num.. 13-039

Investor: Ředitelství silnic a dálnic

Customer: FIRESTA – Fišer, rekonstrukce, stavby a.s.

Technical Data, Description:

Replacement and reconstruction of trolleybus OCS in connection with the replacement of the bridge structure on the main road line Chomutov – Most. The OSC under the bridge has been dismantled, provisionally anchored, and restored after the reconstruction of the bridge. The OSC on the bridge was transferred to one or the other side of the bridge according to the construction stages and in the final state the TV was completely exchanged. Part of the work was the construction of insulation barriers under the bridge, including processing of production documentation.

The overhead contact line is simple, non-compensated, with delta hinges and flexible hinges. The support network from stainless steel ropes is hung on the existing masts. During the work, mobile masts were used. The total length of the new 100 mm2 contact wire was 780 m.

Total Investment cost:  CZK 2 422 620,- (excl. VAT)

Realized in: 4/2017 – 11/2017

Managing Director Office:

Phone: +420 296 500 111
Fax: +420 296 500 700
E-mail: info@elzel.cz, www.elzel.cz
Data box: eaedvez

Address:

Elektrizace železnic Praha a.s.
nám. Hrdinů 1693/4a
140 00 Praha 4
Czech Republic

Bank:

ID: 47115921 TAX ID: CZ47115921

ČSOB Prague, account number: 216025493/0300 Company registered in the commercial register
maintained by the Municipal Court in Prague, section B, insert 1809.

© Copyright - Elektrizace železnic I Designed by Silic Média Creative
Junction Plzeň, 2. construction – Reconstruction of a personal railway... Heating platforms in Liberec
Scroll to top