Reconstruction of Fűgnerova – Mlýnská – Klicperova tram line in Liberec

Investor: Dopravní podnik měst Liberce a Jablonce nad Nisou a.s.

Customer: EUROVIA CS a.s.

Technical Data, Description:

The project, the aim of which was increasing the capacity of the Fügnerova – Nová Ruda tram line, was doubling the track and modifying it for two gauges – 1 000 mm and 1 435 mm. EŽ Praha a.s. delivery included: complete contact line incl. civil works foundations and masts, cable line and heating of platforms at tram stops. Contact line is catenary tensioned by weight situated in HEB masts in direction Fügnerova and with temporary spring anchorage from Fügnerova street in direction Nová Ruda. Contact wire Cu 120 mm2 contact wire, and Cu 120 mm2 and Cu 95 mm2 messenger wires are suspended on fiberglass cantilevers and on cross-spans. The masts are octagonal. Because of the minimum distance of the rail axes the masts have been designed to enable a position regulation. Total length of the contact wire is cca 1 700 m.

Heating of stop platforms is designed with a switchboard located on the mast, feeding of heating cables is realized directly from the contact line.

Total Investment cost:  CZK 11 364 000,- (excl. VAT)

Realized in: 6/2009 – 11/2009
­
­
­­­

Crossroad of Žitavská street x Nákladní x road 1. máje – repair of the tram line in Liberec

Investor: Dopravní podnik měst Liberce a Jablonce nad Nisou a.s.

Customer: Eurovia CS, a.s.

Technical Data, Description:

In the framework of the reconstruction EZ Praha has implemented the heating of the stops. In the repaired section there are 2 opposite areas of the “Nádražní” stop. At the stopping area is a belt heated by heating cables arranged in three separately connected loops. It means two heated platform belts. The switch cabinets are located on the masts. The supply voltage to the control cabinets is output from the overhead contact line.

Total Investment cost:  CZK 473 776,- (excl. VAT)

Realized in: 4/2016 – 6/2016
­
­
­­­

Reconstruction TT Rumunská – Palachova – Šaldovo square in Liberec

Investor: Dopravní podnik měst Liberce a Jablonce nad Nisou a.s.

Customer: Eurovia CS, a.s.

Technical Data, Description:

In the framework of the reconstruction EZ Praha has implemented the heating of the stops. There are 2 opposite areas of the “Šaldovo square” stop in the adjusted section. At the stopping area is a belt heated by heating cables arranged in 2x three separately connected loops. The switch cabinets are located on the masts. The supply voltage to the control cabinets is output from the overhead contact line.

Total Investment cost:  CZK 717 582,- (excl. VAT)

Realized in: 7/2017 – 9/2017